Production capacities
A lifting and launching equipment - a transverse platform with longitudinal movement of the shifted vessel. The maximum dimensions of the docked vessels are as follows:

Docking weight - 4500 tons, Length - 160 m, Breadth - 23 m, Draught - 5.10 m.
An outfitting quay with length of 400 meters, equipped with two 15 tons and a 5 ton crane, water, electricity, compressed air, CO2, acetylene.

.
Building berths

Building berth No.1 – with dimensions 400 x 30 m, Building berth No.2 - with dimensions 250 x 36 m. Both are equipped with four 16 tons gantry cranes, water, electricity, compressed air, CO2, acetylene.
Zero line for preliminary preparation of the metal.
The Zero line for preliminary preparation of metal, including a plate-straightening machine, shot blasting, a chamber for automatical priming, is designed to process sheet metal with sizes up to 3200 mm width and a thickness of 4 to 30 mm.
Steel fabrication workshop with two halls.

The steel fabrication workshop has two halls with same sizes -108 x 36 m, equipped with 12.5 tons and 32 tons cranes. The first hall is equipped with a CNC machine for gas cutting of sheet metal with dimensions 12000 x 4100 mm, a guillotine for cutting of sheet metal with thickness up to 24 mm, a 500 tons hydraulic press, a profile bending machine, a 100 tons horizontal press
One CNC plasma high-speed cutting machine for underwater cutting is located in the second hall with sizes 12000 x 7000 mm .